Bathroom Renovation in Dubai
Al-Rahim Technical Services provides bathroom renovation in Dubai — managed end to end by one licensed fit-out team. Fixed pricing is agreed before work starts, backed by a 100% satisfaction guarantee in writing.
Grout that’s gone grey no matter how hard you scrub, a shower that never quite drains, and fittings that have seen better days — bathroom renovation in a Business Bay high-rise means working around hard water buildup and vertical plumbing shared across floors. Al-Rahim handles both.
Al-Rahim Technical Services has renovated Dubai bathrooms for 10+ years and is licensed by Dubai Government. We manage waterproofing, tiling, plumbing, and fixtures as one job, and we test water pressure and drainage before closing up any wall.
This service fits Business Bay tower residents dealing with hard water scale on old fittings, owners refreshing a bathroom before a new tenancy, and families upgrading a builder-grade bathroom to something more durable. Every bathroom project comes with a competitive, transparent quote before demolition starts.
What’s Included
A bathroom renovation with Al-Rahim generally includes:
- Demolition of old tiling, fixtures, and fittings
- Waterproofing membrane application before retiling
- Full retiling of floor and walls
- Plumbing inspection and pipe replacement where corroded
- New fixtures: toilet, basin, shower, and taps
- Ventilation check to reduce future mold risk
Signs Your Bathroom Needs Renovation
White, chalky buildup around taps and shower heads that won’t come off with regular cleaning is Dubai’s hard water at work, and it’s one of the most common reasons Business Bay residents renovate. Grout that stays grey or black despite scrubbing usually means water has gotten underneath the tile, which is a waterproofing issue, not a cleaning one.
A shower that drains slowly, or a persistent damp smell near the floor, points to a failing drain or a waterproofing membrane that’s broken down — both need attention before they cause damage to the unit below in a high-rise building.
Types & Fixture Options
Porcelain tile resists hard water staining better than ceramic and is the standard choice for Business Bay bathroom renovations. For showers, a walk-in glass enclosure makes cleaning easier and suits smaller bathroom footprints better than a full bathtub-shower combo.
Fixture finish matters more in hard water areas than most homeowners expect — chrome and matte black finishes show water spots less than polished brass or gold-tone fittings. We walk through fixture options that balance appearance with how much maintenance you’re willing to do.
- Porcelain vs ceramic tiling
- Walk-in shower vs bathtub-shower combo
- Fixture finishes: chrome, matte black, brushed nickel
- Water-saving toilet and tap options
What Affects the Price in Dubai
Waterproofing quality is not optional in a high-rise bathroom, and it’s a fixed cost that shouldn’t be cut to save money — a failed membrane can cause water damage to the unit below, which costs far more to fix later. Tile material and fixture brand are the two variables that move price the most within a given bathroom size.
If pipe corrosion is found once old tiling is removed, replacing sections of pipe adds to the original quote. We check pipe condition where accessible during the site survey to flag this risk early, before work starts.
Bathroom Renovation Process in Detail
Work starts with full demolition of old tiling and fixtures, followed by a plumbing and drainage inspection. Any corroded piping gets replaced at this stage, before the new waterproofing membrane goes down and cures.
Once waterproofing is confirmed sound, we retile floor and walls, then install new fixtures — toilet, basin, shower fittings, and taps — followed by a final water test to check pressure and drainage before the bathroom is handed back to you.
Why Choose Al-Rahim for Bathroom Renovation
10+ Years in Dubai
10+ years of hands-on experience across Dubai
Licensed by Dubai Government
Fully licensed and insured on every job
Guaranteed in Writing
100% satisfaction guarantee, in writing
Residential & Commercial
Technicians equipped and experienced for both residential and commercial properties
How It Works
Describe the Job
Call or book online and describe the bathroom renovation you need
Fixed Price On-Site
A licensed technician inspects the job and confirms a fixed price before starting
Done & Checked Together
We complete the work and check it with you before we leave
Frequently Asked Questions
How long does a bathroom renovation take in Business Bay?+
A full bathroom renovation typically takes 7 to 12 working days, including demolition, waterproofing cure time, tiling, and fixture installation.
Why does waterproofing matter so much in a high-rise bathroom?+
A failed waterproofing membrane can let water seep through the floor into the unit below, causing damage you’re liable for. We treat proper waterproofing as a non-negotiable step in every renovation.
Can you fix hard water staining without a full renovation?+
For fixtures alone, replacing taps and shower heads with new ones can resolve visible staining. For grout and tile staining below the surface, a retiling is usually needed for a lasting fix.
Will I have a working bathroom during the renovation if I have only one?+
If your unit has only one bathroom, we recommend arranging alternative access during the 7 to 12 day renovation, since the space is unusable during demolition and tiling.
Do you replace old, corroded pipes as part of the renovation?+
Yes, we inspect exposed pipework once old tiling is removed and replace any corroded sections before retiling, flagging the additional cost to you first.
Can you install a walk-in shower instead of a bathtub?+
Yes, converting a bathtub to a walk-in shower is a common request and can usually be done within the same renovation timeline, subject to plumbing layout.